Want to know Exambible PK0-003 Exam practice test features? Want to lear more about CompTIA CompTIA Project+ (2009) certification experience? Study High quality CompTIA PK0-003 answers to Latest PK0-003 questions at Exambible. Gat a success with an absolute guarantee to pass CompTIA PK0-003 (CompTIA Project+ (2009)) test on your first attempt.

2017 NEW RECOMMEND

Free VCE & PDF File for CompTIA PK0-003 Real Exam
(Full Version!)

Pass on Your First TRY 100% Money Back Guarantee Realistic Practice Exam Questions

Free Instant Download NEW PK0-003 Exam Dumps (PDF & VCE):
Available on:
http://www.certleader.com/PK0-003-dumps.html

Q161. – (Topic 2) 

A project manager wants to ensure the project maintains funding and satisfies the intent of the project. Which of the following functions within the communication plan can reduce scope creep? 

A. Implementing change requests 

B. Periodically updating stakeholder 

C. Updating risk register with changes 

D. Analyzing performance information 

Answer:

Q162. – (Topic 3) 

A project manager is leading a rapid-improvement project. The project sponsor has requested the team focus on risk avoidance as part of the project. Which of the following strategies would fulfill the sponsor’s requirements? (Select TWO). 

A. Creating management reserves 

B. Reducing the scope 

C. Outsourcing key development efforts 

D. Investing in warranty support capacity 

E. Increasing resource availability 

F. Prototyping 

Answer: B,E 

Q163. – (Topic 1) 

The project team is geographically split between two time zones. Which of the following should be performed by the project manager? 

A. Escalate to the project sponsor with a preference to replace the remote members with local members. 

B. Set up meeting times that are not necessarily a perfect fit, but are fair to both locations. 

C. Schedule two separate meetings at the desired local time for the participants. 

D. Convert traditional meetings into email updates and catch up on an exceptions basis. 

Answer:

Q164. – (Topic 1) 

The project manager has completed an impact analysis on a proposed change request. Which of the following is the BEST action for the project manager to take NEXT? 

A. Review the budget contingencies to see if the cost increase will be covered. 

B. Ask the project sponsor if the change is approved. 

C. Schedule a meeting to discuss the change with stakeholders. 

D. Consult the project team to determine the magnitude of the change. 

Answer:

Q165. – (Topic 2) 

A defect in an application code is observed and documented in the middle of a project. The defect is noted as a security risk and requires immediate action. Who is responsible for approving the required fix? 

A. Contracting officer 

B. Lead developer 

C. Change control board 

D. Risk management team 

Answer:

Q166. – (Topic 3) 

Once all of the requirements have been gathered and development is ready to begin, which of the following should be the project manager's NEXT step? 

A. Create a project plan 

B. Update the scope document 

C. Obtain approval 

D. Perform fast tracking 

Answer:

Q167. – (Topic 3) 

Which of the following can be used when a risk threat is identified? 

A. Acceptance 

B. Enhancing 

C. Sharing 

D. Exploiting 

Answer:

Q168. – (Topic 2) 

Given the following activity: 

Provide details of errors within the software that occur during verification testing that provide enough evidence that allows the software developers to resolve the errors. 

Which of the following components is this known as within the quality management plan? 

A. Quality control 

B. Quality metrics 

C. Quality baseline 

D. Quality assurance 

Answer:

Q169. – (Topic 1) 

One of the project’s team members assigned to work on a specialized set of tasks has suddenly become unavailable and unreachable. Which of the following can the project manager do to ensure the tasks are completed with minimal impact to the project? 

A. Update the risk matrix and inform the stakeholders 

B. Reassign the task to a member of the extended team 

C. Adjust the schedule to the right to account for the team member 

D. Remove the tasks from the timeline if they are not in the critical path 

Answer:

Q170. – (Topic 2) 

Which of the following is a cost estimation technique that uses historical data? 

A. Expert judgment 

B. Parametric estimating 

C. Reserve analysis estimating 

D. Group decision-making techniques 

Answer: