The only 2v0 620 exam resources for you

It is impossible to pass VMware 2v0 620 exam exam without any help in the short term. Come to Testking soon and find the most advanced, correct and guaranteed VMware 2v0 620 dump pdf practice questions. You will get a surprising result by our Up to date vSphere 6 Foundations Beta Exam practice guides.

2017 NEW RECOMMEND

Free VCE & PDF File for VMware 2V0-620 Real Exam
(Full Version!)

Pass on Your First TRY 100% Money Back Guarantee Realistic Practice Exam Questions

Free Instant Download NEW 2V0-620 Exam Dumps (PDF & VCE):
Available on:
http://www.certleader.com/2V0-620-dumps.html

Q61. After installation of a host in your test environment, you need to move it to production. The only major change that needs to be made is that the hostname of the server needs to change. 

What are two ways that an administrator can change the host name without editing configuration files on the host directly? (Choose two.) 

A. Login to the Direct Console User Interface and change it from here. 

B. Edit the Default TCP/IP Configuration from the vSphere Web Client. 

C. Use the Ruby vSphere Client to send a script to the ESXi host that updates the hostname. 

D. Update the information in DNS and the ESXi host will automatically update with these changes. 

Answer: A,B 

Q62. Why are some virtual machines orphaned after rebooting a High Availability (HA) enabled host? 

A. The Orphaned virtual machines have HA restart disabled. 

B. The Orphaned virtual machines moved recently and the change did not persist. 

C. The host is attached to failed storage. 

D. The host just came out of maintenance mode. 

Answer:

Q63. An attempt to enable vSphere Fault Tolerance for a powered-on virtual machine fails. 

Which two scenarios would result in this failure? (Choose two.) 

A. The virtual machine has three vCPUs configured. 

B. The host on which the virtual machine is running has insufficient memory resources. 

C. The virtual machine has insufficient resources to accommodate full reservation plus the overhead memory. 

D. VMware High Availability is enabled on the cluster of which this host is a member. 

Answer: B,C 

Q64. Which three features can be enabled for a new host cluster? (Choose three.) 

A. Storage Distributed Resource Scheduling 

B. High Availability 

C. Fault Tolerance 

D. Distributed Resource Scheduling 

E. Virtual SAN 

Answer: B,D,E 

Q65. Which vSphere 6 Standard Edition feature will allow an organization to ensure that critical multi-threaded applications have the maximum possible uptime? 

A. Fault Tolerance 

B. High Availability 

C. Distributed Resource Scheduler 

D. App HA 

Answer:

Q66. Which two are true about the Risk badge in vRealize Operations? (Choose two.) 

A. The Risk badge indicates potential future problems that may degrade the performance of the system. 

B. Risks may require attention in the near future. 

C. The Risk badge indicates problems that are degrading performance of the system. 

D. Risks require attention now to correct system performance problems. 

Answer: A,B 

Q67. How are ports scaled on vSphere Standard Switches (vSS)? 

A. Ports on a vSS can be dynamically scaled up and down. 

B. Ports on a vSS can only be statically scaled up or down. 

C. Ports on a vSS can only be dynamically scaled down. 

D. Ports on a vSS can only be dynamically scaled up. 

Answer:

Q68. An administrator has a virtual machine that requires four times the compute resources than other virtual machines on the same ESXi 6.x host. 

How should the administrator configure the virtual machine settings, in order to be prepared for any resource contention? 

A. Set the shares of the priority virtual machine to High and the rest to Low. 

B. Set the shares of the priority virtual machine to High. 

C. Set the shares of the priority virtual machine to High and the rest to Normal. 

D. Set the shares of the priority virtual machine to Normal and the rest to Low. 

Answer:

Q69. An organization has configured Distributed Power Management (DPM) on a vSphere 6 cluster. The organization wants to be alerted when an ESXi host has been powered down by DPM. 

Which two options represent the type and name of the alarm that would accomplish this? (Choose two.) 

A. DrsEnteringStandbyModeEvent 

B. DrsEnteredStandbyModeEvent 

C. Event-based 

D. Condition-based 

Answer: B,C 

Q70. You are creating a virtual machine in the Web Client using the New Virtual Machine wizard. 

Which two steps are required? (Choose two.) 

A. Select a valid name. 

B. Select a cluster for the compute resource. 

C. Select a network adapter. 

D. Select the virtual machine compatibility. 

Answer: A,D 

Certleader Dumps
Certleader is a company specialized on providing high quality IT exam materials and fully committed to assist our respected clients crack any IT certification tests on their 1st efforts.